Rolling Energy

BESS Calculator

Industrial decision-support for Solar + Battery sizing

Estimate recommended capacity, PCS power, savings stacks, and finance fit from your operating conditions—not a toy battery estimator.

Industrial operating inputs

Decision-support model for C&I BESS screening. Final sizing follows interval data, SLD review, and site survey.

Intelligent recommendation

Confidence: High · Finance fit: Hybrid / PPA-style

Battery size

450 kWh

Usable capacity

400 kWh

PCS / inverter

250 kW

Chemistry

LFP

Cycles / year

370

Peak shaving

150 kW

Utilization

66%

Annual savings

₹13,63,586

Indicative CAPEX

₹1,12,50,000

Payback

8.3 yrs

ROI

12.1%

CO₂ reduction

70.2 t/yr

Demand charge savings

₹7,69,500/yr

Energy / TOD value

₹2,34,986/yr

Diesel savings

₹3,59,100/yr

Why this recommendation

  • • Peak response sized near 150 kW based on maximum demand (850 kVA), contract demand, and day/night load spread.
  • • Backup requirement of 1.5 h on 25% critical load implies ~338 kWh usable energy.
  • • Existing / planned 750 kWp solar drives shifting energy of ~190 kWh/day into evening or peak windows.
  • • Time-of-Day tariff enabled — EMS will prioritize charge/discharge around peak windows.
  • • Demand charge savings estimated from ~143 kVA reduction at ₹450/kVA.
  • • DG available — hybrid mode assumed to cut short-outage diesel starts and improve loading.

Request a detailed assessment

Share your details and we will review this screening with our C&I engineering team.

Daily load, solar & battery dispatch

Battery SOC through the day

Demand reduction (kVA)

Cashflow & ROI timeline (30-year horizon)

Need interval-data grade modeling?

We’ll refine dispatch using your load curves and tariff schedule.