Hospital · BESS
Hospital Backup System
Hospital BESS provides a controlled bridge for selected critical loads and reduces diesel starts during short outages.
Project size
350 kWh / 175 kW
Annual savings
₹28,00,000
Demand reduction
95 kVA
Annual ROI
14%
Payback
6.1 years
Location
Hyderabad, Telangana
Load profile
Critical services with strict autonomy targets; demand management as secondary benefit.
Performance metrics
Autonomy
2.0 hrs critical
DG starts avoided
~40%/yr
Safety design
Hospital EHS
Monitoring
24×7
- • Defined critical load schedule
- • Interface with existing UPS/DG
- • Facilities training & SOPs