Rolling Energy
500 kWh Battery for Pharmaceutical Plant

Pharmaceutical · BESS

500 kWh Battery for Pharmaceutical Plant

An LFP containerized BESS reduced billed maximum demand and provided engineered backup for selected utilities without compromising site EHS protocols.

500 kWh Battery for Pharmaceutical Plant

Project size

500 kWh / 250 kW PCS

Annual savings

₹42,00,000

Demand reduction

180 kVA

Annual ROI

18%

Payback

5.2 years

Location

Pune, Maharashtra

Load profile

Daytime HVAC-heavy with short utility peaks; critical clean-utility backup window of 1.5 hours.

Performance metrics

Cycles / year

~320

RTE (system)

92%

Solar paired

750 kWp

DG runtime cut

28%

  • • Peak shaving + solar self-consumption modes
  • • SCADA integrated with plant energy desk
  • • Fire detection and HVAC packaged in container
Model a similar BESS

Ready to engineer your industrial energy transition?

Book a complimentary energy assessment for your factory, warehouse, or commercial campus.

Site SurveyBESS CalcBrochure