Textile · BESS
2 MWh Peak Shaving for Textile Industry
A power-oriented BESS prioritized demand charge reduction with secondary solar shifting on a captive rooftop portfolio.
Project size
2 MWh / 1 MW PCS
Annual savings
₹1,85,00,000
Demand reduction
850 kVA
Annual ROI
24%
Payback
3.9 years
Location
Surat, Gujarat
Load profile
High continuous process load with sharp coincidence peaks during machine banks start-up.
Performance metrics
Peak cut
850 kVA
Utilization
61%
Payback
3.9 yrs
Chemistry
LFP
- • 1 MW PCS for aggressive peak response
- • Bankable LFP racks with string-level BMS
- • Remote monitoring with ticketed O&M
Ready to engineer your industrial energy transition?